Overview
There are disruptions due to construction work around Melbourne Airport. Please check this list so you can plan ahead.
Due to ongoing construction in the T123 car park pick-up and drop-off areas, passengers should plan for potential delays of up to an hour during peak times.
To avoid congestion, we recommend using the equivalent pick-up and drop-off facilities at nearby Terminal 4 car park, just a short 10-minute walk from Terminals 1, 2, and 3. Simply drive to the Terminal 4 Car Park and proceed to Level 2 for drop-offs or Level 1 for pick-ups.
Please refer to the map below, where each impact is labelled with a corresponding number for easy reference.
Terminal 1, 2, 3 Forecourt
- No works planned
Terminal 1, 2, 3 Car Park
- Lift Upgrades
- Ongoing in front lobbies (T1 and T3 ends) from 30 June to 8 August.
- Two of the three lifts remain operational in each lobby.
- Access to Levels 3–6
- Use rear lifts if entering from the back of the car park.
- Or take the front lifts to Level 2 and follow signage to the rear lift lobby.
- Note: Front lifts only operate between Ground and Level 2. Access to Level 3+ via front lifts is permanently closed due to drop-off zone works.
- PARKROYAL Access
- Level 2 access closed.
- Use the central ground floor lobby of the T123 Car Park.
- Bay Closures
- Levels 1–6: 20 bays permanently closed on each level for lift installation.
- Level 2: 580 bays temporarily closed (former Premium Valet area).
- Level 3: 560 bays permanently closed for drop-off zone construction.
- Car Park Exit
- Four boom gates operational.
- Daytime lane closures in place from 8:00am–3:00pm.
- Exit helix ramp (L3 to L2) closed until late September 2025 — follow detour signs via internal Level 3 ramp.
- Car Park Entry
- Single-lane entry reduction in place for scaffolding installation.
- Works ongoing until October 2025.
- Car Rental Returns
- Access remains via Centre Road.
- A new secondary exit lane is now operational.
Terminal Drive / Arrivals Drive / Departures Drive
8. Arrivals Drive
- Reduced to three lanes.
- Lanes 2, 3, and 4 exit via Melbourne Drive.
9. Pedestrian Access
- Detour remains in place between Value Car Park and the terminals.
9A. Bonney Court
- Lane closed and pedestrian access shifted on Tuesday 22 July from 7:00am–4:00pm.
10. Departures Drive (T1 End)
- Reduced to one lane.
- Works continuing through December 2025.
T4 Terminal Car Park
11A. Naarm Way Ramp
- One lane remains closed on the ramp from Tullamarine Freeway to T4 Car Park.
11B. Full Ramp Closure (Tullamarine Fwy to T4)
- Scheduled overnight closure: Tuesday 22 July, 11:00pm–4:00am.
- Detours in place. Pick-up and drop-off via the Terminal 1–3 Forecourt.
11C. Naarm Way Off-Ramp – Night Works
Nightly lane closures continue through Thursday 24 July, from 8:00pm–6:00am
Business Carpark
12. Access Closed
- No access available during this period.
Centre Road
13A. Northbound Fast Lane Closure
- Closed Monday 21 & 22 July, 10:00pm–11:59pm.
- Detour via Tullamarine Freeway.
13B. Northbound Slow Lane Closure
- Closed Monday 21 & 22 July, 11:00pm–4:00am.
- Detour via Tullamarine Freeway.
14. Double Fast Lane Closures (Holiday Inn)
- Northbound and Southbound closures on 22 July from 10:00pm–4:00am.
Tips for Travellers
- Staff will be available in the forecourt area to assist.
- Please allow up to 30 minutes of additional travel time due to delays, detours, and extended walking routes.
- For quicker pick-up, consider using the Terminal 4 Pick-Up Area to avoid congestion at T123.
Upcoming Road Works – Departures Drive & Naarm Way Ramp Closures
To support the next stage of Naarm Way Stage 2 construction, there will be significant overnight road works impacting Departures Drive and the Naarm Way Ramp. Please allow extra travel time and follow all signage and detours.
Departures Drive – Night Works
Road works will occur overnight between 11:00pm and 5:00am on the following dates:
- 28 – 31 July: Full closure of Arrival Drive
- 4 – 8 August: Two lanes closed on Arrival Drive
- 11 – 15 August: Two lanes closed on Arrival Drive
Naarm Way Ramp – Full Closure
Please be advised that from 10:00pm Wednesday 23 July to 5:00am Thursday 24 July, the Naarm Way ramp will be fully closed to allow for the removal of an overhead gantry sign.
A contingency closure is scheduled from 10:00pm Thursday 24 July to 5:00am Friday 25 July, in case the works are delayed by weather.
During this period:
- Access to Terminal Parking will be via the Ground Floor of the Terminal 4 Car Park
- Terminal 4 Pick-Up & Drop-Off will be redirected to the Terminal 1, 2 & 3 Forecourt
- Premium Self Park Terminal 4 will be redirected to the Premium Self Park Terminal 1, 2, 3
We appreciate your patience while these essential upgrades are completed. Please plan ahead and allow extra time for your journey.