ALL car parks are very busy over the Easter period, with limited drive-up spots available. Please consider alternative transport options. Please have your QR code ready for a smooth entry and exit. Our roads and car parks may have changed since your last visit. Due to ongoing construction in the T123 car park pick-up and drop-off areas, passengers should plan for potential delays of up to an hour during peak times. Learn about the Naarm Way Stage 2 project to plan ahead: https://www.melbourneairport.com.au/plan-ahead. To avoid congestion, we recommend using the equivalent pick-up and drop-off facilities at nearby Terminal 4 car park, just a short 10-minute walk from Terminals 1, 2, and 3. Simply drive to the Terminal 4 Car Park and proceed to Level 2 for drop-offs or Level 1 for pick-ups. Thank you for your patience.

概述

墨尔本机场致力于环境可持续发展,是澳大利亚第一个承诺到 2025 年实现范围 1 和 2 净零排放目标的主要机场。

可再生能源的使用将在实现这一目标方面发挥关键作用。我们的目标是到 2030 年通过现场太阳能发电满足一半的能源需求。

2021 年,我们开始运营 我们的第一个太阳能发电场,这是一个位于奥克兰交界处的 12 兆瓦 (MW) 设施,位于南北跑道的入口处。该太阳能发电场占地16公顷,是澳大利亚所有机场中最大的太阳能装置。

此外,我们商业园区的所有新商业开发项目在结构上都已准备好在屋顶上安装太阳能。

安装更多太阳能

2023年,我们开始建设第二个太阳能发电场。North Airfield太阳能发电场将产生7.5兆瓦的能源,并将毗邻我们现有的Oaklands Junction太阳能发电场,位于Sunbury Road和Oaklands Drive的拐角处。它将包括大约20,000块太阳能电池板。 

可以产生多少功率?

这两个太阳能发电场将覆盖约40个足球场的面积。

第二个太阳能发电场建成后,这两个太阳能发电场每年将产生 34 吉瓦时 (GWh) 的能源,共同满足机场总能源消耗需求的约 40%。这足以为端子 1、2、3 和 4 供电。

墨尔本机场的绿色电力网络

墨尔本机场是澳大利亚第一个也是唯一一个成为GreenPower®批准供应商的机场。这意味着我们可以向墨尔本机场物业的零售商、租户和合作伙伴提供现场产生的GreenPower®认证太阳能。 

在此处了解有关墨尔本机场 由本土能源驱动的绿色电力®网络的更多信息。

实况报道

北机场太阳能发电场