The car parks at Melbourne Airport are busy this week The Value Car Park is nearly sold out Thursday, Friday, Saturday, Sunday and Monday. If you do have a car park booking, please arrive 30 minutes earlier than usual and have your QR code ready for a smooth entry and exit. Due to ongoing construction in the Terminal T1 T2 T3 car park pick-up and drop-off areas, passengers should plan for potential delays of up to an hour during peak times if you are being dropped off by a loved one, taxi or Uber. To avoid congestion, we recommend using the equivalent pick-up and drop-off facilities at nearby Terminal 4 car park, which is a 10-minute walk to and from Terminals 1, 2, and 3. Simply drive to the Terminal 4 Car Park and proceed to Level 2 for drop-offs or Level 1 for pick-ups. Thank you for your patience while we are building your airport.

Stormwater Legal Point of Discharge

Overview

Stormwater Legal Point of Discharge refers to the designated location where stormwater runoff from a property or development is legally allowed to be released into the wider Melbourne Airport stormwater network.

All construction activities at Melbourne Airport which alters the existing stormwater network and/or connects to the stormwater network will require a Legal point of Discharge application to be submitted and approved prior to the commencement of works.

Understanding and adhering to the legal point of discharge application process is essential for responsible stormwater management at Melbourne Airport.

How to apply for a permit

  1. Complete the Stormwater Legal Point of Discharge application and ensure:

    a. A sketch/drawing indicating location of proposed connection into APAM drainage asset is provided
  2. Email completed form to APAM Civil team via [email protected]
  3. Application on approval will be returned to applicant

Download theĀ application form by clicking here.